Federal Power Act (FPA)

Font Size: A | A | A

THE FEDERAL POWER ACT

Hydropower Licensing and Consideration of Environmental Values

 

I. OVERVIEW

There are over 2,000 hydropower dams in the United States with licenses issued by the Federal Energy Regulatory Commission (FERC) under the authority of the Federal Power Act (hereinafter “Act’). Most of the licenses issued by FERC between 30 to 50 years ago were issued with little or no attention given to environmental protection. As a result, many of the dam rental agreements we are living with today were designed solely to benefit power generation, written decades ago when we did not understand the damage that poorly operated dams do to our rivers.

Beginning in the early 1990’s, many of the licenses for these dams began to expire. In the next 15 years, 593 licenses will expire, affecting thousands of miles of rivers nationwide.. In the licensing process, dam owners can improve the health and recreational use of our rivers by:

  • Restoring more natural river flows below their dams,
  • Minimizing the fluctuations of reservoir levels,
  • Providing fish with safe passage around their dams,
  • Restoring habitat for river wildlife,
  • Maintaining appropriate water quality—such as temperature and oxygen levels—in the river, * Protecting riverside lands from erosion, and
  • Enhancing recreational opportunities.

The Federal Power Act, 16 U.S.C. § 791-828(c), passed in 1920 and amended in 1935 and 1986, created the Federal Energy Regulatory Commission (FERC), an independent regulatory agency that oversees the natural gas, oil, and electricity markets, regulates the transmission and sale of these energy resources (except for oil), provides licenses for non-federal hydroelectric plants, and addresses environmental matters arising in any of the areas above. The agency is governed by a five member commission appointed by the President with the advice and consent of the Senate, 16 U.S.C. § 792.

 

II. HYDROPOWER LICENSING

The Federal Power Act (FPA) authorizes the Federal Energy Regulatory Commission (FERC) to issue exemptions or licenses to construct, operate and maintain dams, water conduits, reservoirs, and transmission lines to improve navigation and to develop power from streams and other bodies of water over which it has jurisdiction. 16 U.S.C. § 797(e).

FERC’s jurisdiction extends to all hydropower dams not owned by the federal government that either:

  1. occupy federal public lands or federal reservations;
  2. are located on navigable streams;
  3. use surplus water or water power from a federal government dam; or
  4. were constructed after August 26, 1935 and are located on a non-navigable stream that affects the interests of interstate or foreign commerce (including providing power to an interstate power grid).

Navigable waters include parts of stream or other bodies over which Congress has jurisdiction to regulate commerce which, either in their natural or improved condition, are suitable for use to transport persons or property in interstate or foreign commerce. According to the Act, hydropower licenses are not to exceed 50 years in length. 16 U.S.C. §§ 797, 798-802.

 

III. CONSIDERATIONS OF THE PUBLIC INTEREST AND ENVIRONMENTAL ISSUES IN LICENSING

Before 1986, dam licenses issued by FERC primarily considered a river’s power generation potential in issuing licenses, often without regard for the project’s environmental impacts. The 1986 amendments to the Federal Power Act required FERC, when deciding whether to issue a license, to consider not only the power generation potential of a river, but also to give equal consideration to other values such as energy conservation, protection of fish and wildlife, recreational opportunities, and preservation of general environmental quality. In addition, more attention has been paid the 1920 Act’s requirements that FERC consult with other agencies and that licenses contain conditions discussed in more detail below.

[Note: Licensing private hydroelectric power projects regulated by FERC must also comply with laws other than the Federal Power Act such as the Endangered Species Act, Clean Water Act, and National Environmental Policy Act. This outline does not contain a discussion of these laws that can have significant impacts on the licensing process.]

A. Section 4(e)- Conditions Applying to Projects Located within a Federal Reservation

Under Section 4(e) of the Act, 16 U.S.C § 797(e), FERC must consider environmental requirements for licensing a project within a federal reservation. A federal reservation under the Act is a technical term, defined generally as a national forest, tribal land, military reservations, and other lands and interests in lands reserved for other public purposes. They include any lands and interests in lands acquired and held for any public purposes by the federal government (they do not include national monuments or national parks, where hydropower licensing is prohibited).

There are two substantive requirements for licensing a project within a federal reservation:

  1. FERC must find that the license will not interfere with or be inconsistent with the purposes for which the reservation was created or acquired.
  2. A license must be issued on terms that the federal agency responsible for the reservation finds are necessary for the adequate protection and utilization of that reservation. This is not a veto power, and the land managing agency may not prevent FERC from issuing the license. However, the land managing agency’s conditions must be included within the FERC license or it cannot be issued.

B. Section 18- Conditions Applying to Projects That May Affect Fish Passage

Section 18 of the Federal Power Act states that FERC “shall require the construction, maintenance, and operation by a licensee at its own expenses of such…fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate.” 16 U.S.C. § 811. The federal fish agency may prescribe a fishway that, in its judgment, is necessary to maintain all life stages of the fish impacted by the project.

The prescription is limited to

  1. Physical structures, facilities, or devices necessary for such protection; and
  2. Project operations and measures related to structures, facilities, or devices necessary to ensure effectiveness. These conditions may be applied in the FERC license or FERC may reserve its authority to include a fishway prescription in the future.

C. Section 10(j)- Requirement to Solicit Recommendations from Other Agencies

Amendments to the Act in 1986 added an additional requirement that FERC consider both power and non-power resources, and to solicit recommendations on license conditions from the U.S. Department of Commerce’s National Marine Fisheries Service, the U.S. Department of Interior’s U.S. Fish and Wildlife Service, and state fish and wildlife agencies. 16 U.S.C. § 803(j) (known as 10(j) recommendations).

FERC must give deference to these recommended conditions but can still alter or reject them by following prescribed procedures. A section 10(j) recommendation need not be included in a FERC license as opposed to a Section 4(d) or Section 18 requirement outlined above.

D. Section 10(a)- Giving Equal Consideration to Non-Power Values

In the 1986 amendments to the Act, Congress also broadened the scope of FERC’s duties, requiring the Commission to “give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.” 16 U.S.C. § 801(a)(1) (Section 10(a)(1)). Thus, the Act obligates FERC to give equal consideration to non-power values.

 

IV. THE LICENSING PROCESS

The general timeline for the standard licensing process is as follows:

  1. Five years before its license expires, a utility notifies FERC that it intends to seek a new license. It then develops an application that provides important data on the environmental and recreational impacts of its dam(s) and identifies areas for further study. Extensive research then begins.
  2. Two years before its license expires, a utility submits a formal application to FERC detailing how the utility proposes to operate its dam(s). Other government agencies and citizens groups can comment on this application and recommend, and in some cases require, conditions for dam operations. The Commission then conducts an environmental impact statement.
  3. FERC approves the license if it is deemed “in the public interest.” The license must protect fish and wildlife, meet water quality standards, provide fish passage if necessary, protect surrounding lands, and improve recreation opportunities. The final license decision can be appealed to FERC, and then beyond to federal courts.

Because FERC licenses are issued for terms between 30-50 years, relicensing is characterized as a “once in a lifetime” opportunity to restore many of the environmental and social values that characterized a river prior to existence of a dam. The Federal Power Act’s requirements to including consideration of public and environmental values in licensing proceedings has provided river advocates with a major tool for conservation and restoration. Since 1993, more than 400 projects have been relicensed.

 

Related News

 


HRC Coalition Members File Joint Comments on Enloe Hydroelectric Project

By: Rich Bowers  Thursday March 11, 2010

HRC Coalition members in Washington State filed comments on the Enloe Hydroelectric Project on the Similkameen River.  Due to the inadequate analysis of the record, Coalition members found this project to be not yet ready for Environmental Analysis.

 


John Norris to Join FERC

By: Rupak Thapaliya  Monday December 28, 2009
Region: National
Key Words: commissioners | FERC

The Senate, last Thursday, confirmed John Norris to be the newest member of the Federal Energy Regulatory Commission.

Norris is currently serving as chief of staff for Secretary of Agriculture Tom Vilsack. He served as the chairman of the Iowa Utilities Board from 2005 to 2009.

 


Commissioner Kelly To Leave FERC

By: Rupak Thapaliya  Thursday September 24, 2009
Region: National
Key Words: commissioners | FERC

FERC Commissioner Suedeen Kelly will not be seeking a third term at FERC. President Obama had recently nominated Kelly to her third term but her nomination was pending in the Senate Energy and Natural Resources Committee.

 


FERC and MMS Provide Further Clarification

By: Rupak Thapaliya  Friday August 7, 2009

Following a Memorandum of Understanding in April 2009, the Federal Energy Regulatory Commission (FERC) and the Minerals Management Service s(MMS) have issued a guidance document that clarifies a lot of the process and jurisdictional questions regarding development of hydrokinetic projects on the Outer Continental Shelf (OCS).

 


President Obama Nominates John Norris to FERC Commissioner

By: Rupak Thapaliya  Friday June 12, 2009

President Obama has nominated John R. Norris, Chief of Staff for Agriculture Secretary Tom Vilsack, to serve as the Commissioner at FERC.

 


FERC and Washington Sign MoU on Development of Hydrokinetic Projects

A Memorandum of Understanding (MoU) was signed between FERC and the State of Washington to streamline the regulatory structure for development of hydrokinetic projects in Washington.

 


FERC and MMS Clarify Jurisdictional Issues

By: Rupak Thapaliya  Friday April 10, 2009
Region: National

After months of row between FERC and Mineral MMS under the DOI over jurisdiction over renewable energy projects on the Outer Continental Shelf, the two agencies signed a MOU yesterday that clarifies each agency's roles and responsibilities.

 


HRC and National Hydropower Association Congratulate Salazar and Wellinghoff on Commitment to Resolve Jurisdictional Dispute

By: Rupak Thapaliya  Friday March 27, 2009
Region: National
Key Words: DOI | FERC | MHK | NHA | renewable energy

The Hydropower Reform Coalition and the National Hydropower Association sent a letter this week to Interior Secretary Ken Salazar and Federal Energy Regulatory Commission Chairman Jon Wellinghoff congratulating them for committing to resolve the jurisdictional dispute over the siting and licensing of ocean energy projects on the Outer Continental Shelf.

Find the joint press release and the letter.


Wellinghoff Named FERC Chairman, Kelly Re-appointed

By: Rupak Thapaliya  Friday March 20, 2009

In an announcement made yesterday, President Barack Obama has designated Jon Wellinghoff to be the Chairman of Federal Energy Regulatory Commission and re-appointed Suedeen G. Kelly as a Commissioner.

 


FERC Rejects Climate Change Study

By: Rupak Thapaliya  Friday March 13, 2009
Region: National | California
Key Words: climate change | FERC | Yuba
States: California

In a move that has disappointed many, FERC has rejected a request to predict and evaluate the changes in project effects that will occur as a result of climate change that is likely to impact the local patterns of precipitation, runoff, evapo-transpiration and other meteorological patterns in two watershed in California.