Bond Falls : P-1864

« Go Back
Loading...

Summary

  • P-1864
  • W Br Ontonagon R
  • Midwest
  • MI
  • 12.00 MW

License

  • Download License
  • 08-20-2003
  • 07-31-2043
  • UPPER PENINSULA POWER COMPANY

Description

The Bond Falls project has following four developments:

Bond Falls
  • On middle branch of Ontonagon River
  • 45 ft high, 900 ft long main dam
  • 35 ft high, 850 ft wide control dam
  • Stored water diverted to the Victoria dam where electricity is generated
Bergland 
  • On west branch of Ontonagon River
  • 4 ft high, 179 ft long dam
  • Controls water level in Lake Gogebic (natural lake)
Cisco
  • On the Cisco branch of Ontonagon River
  • 11 ft high, 21 ft long dam
  • Controls Cisco Lake
  • No minimum flow requirement for Cisco
Victoria
  • On west branch of Ontonagon River
  • 118 ft high, 301 ft long dam
  • Controls Victoria reservoir with spillway of 4 gated bays
  • 1.6 mile long bypass
  • Has the only powerhouse with two turbines, 6 MW each.
Read this summary for more detailed information on the project.