Damariscotta Mills : P-11566

« Go Back
Loading...

Summary

  • P-11566
  • Damariscotta River
  • East
  • ME
  • 0.46 MW

License

  • Download License
  • 12-04-2003
  • 11-30-2033
  • RIDGEWOOD MAINE HYDRO PARTNERS, L.P

Description

The existing Damariscotta Mills project consists of a 5-foot-high, 124-foot-long concrete dam with three stoplog bays referred to as the “Fishway Dam,” a 5-foot-high, 40-foot-long dike, and other project facilities.

The project is located on theDamariscotta River, in Lincoln County, Maine.

The average annual generation is 1,250 megawatt-hours (MWh).