Waterway: Killisnoo Inlet

Authorized capacity: 0.25 mW

License issued:
License expires:

Licensee:

Update: FERC canceled the preliminary permit for this project in March 2013 citing lack of lack of progress report.

Proposed tidal energy project; a moored test platform or dock, or underwater tethering device; 10 25kW Red Hawk in-stream turbine modules for a total generating capacity of 250 kW; 650-foot-long, 480-volt underwater transmission line