Main Canal No. 6 P-5038
General information | |
Waterway |
Main Canal |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-5038 |
FERC project name | Main Canal No. 6 |
Permit issued | 10/18/81 |
Ownership and operation | |
Owner | Boise Project Board of Control |
Owner type | Publicly Owned Utility |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 1.1 MW |
Is there something you’d like to add or correct? Please let us know.