AK

Nenana Rivergen : P-13883

[ Archived / decommissioned ]

Waterway: Tanana River

Authorized capacity: 0.3 mW

License issued:
License expires:

Licensee:

The preliminary permit was surrendered in March 2013.

Proposed in-river hydrokinetic project with

  • 6 turbines;
  • 450-foot-long, 24.9 kV transmission;
  • road access (no information).