CT

Pomperaug : P-12790

[ Active ]

Waterway: Pomperaug River

Authorized capacity: 0.08 mW

License issued: 10/16/2014
License expires: 9/30/2054

Licensee:

The 76-kilowatt (kW) project would be located at an existing dam on the Pomperaug River, a tributary of the Housatonic River, in Woodbury,Connecticut. The project will use the 15-foot-high Pomperaug River Dam, which will be equipped with a new steeppass fish ladder. The powerhouse will contain a 76-kW turbine and will be located in an existing mill building.