by Tom O'Keefe | Jul 18, 2022
The North Umpqua Project was constructed between 1947 and 1956. It consists of a series of dams and canals that divert water to the eight developments, each of which has a powerhouse and a dam. The Clearwater No. 1 Development is the uppermost development on the...
by Kevin Lewis | Mar 2, 2021
New License / Under Construction Proposed Project Facilities The Swan Lake North Project will consist of a new upper and lower reservoir, a high-pressure steel penstock connecting the upper reservoir with the powerhouse, a powerhouse with generating/pumping...
by Hydropower Reform Coalition | Mar 2, 2021
The existing Damariscotta Mills project consists of a 5-foot-high, 124-foot-long concrete dam with three stoplog bays referred to as the “Fishway Dam,” a 5-foot-high, 40-foot-long dike, and other project facilities. The project is located on theDamariscotta River,...
by Hydropower Reform Coalition | Mar 2, 2021
by Hydropower Reform Coalition | Mar 2, 2021