Pelton Round Butte Project, Deschutes River, Oregon

Pelton Round Butte Project, Deschutes River, Oregon

The Pelton Round Butte Hydroelectric project is owned by Portland General Electric Company (PGE) and the Confederated (Wasco, Warm Springs and Paiute) Tribes of the Warm Springs Reservation of Oregon (Tribes), and consists of three developments located on the Deschutes River, Crooked River, and Metolius River.

Enloe Project, Similkameen River, Washington

Enloe Project, Similkameen River, Washington

The Enloe Hydroelectric project is one for which a new license has been issued to construct, operate and maintain by the Public Utility District No. 1 of Okanogan County (Okanogan PUD). The project site is located on land managed by the Bureau of Land Management (BLM).

Winfield Project, Kanawha River, West Virginia

Winfield Project, Kanawha River, West Virginia

The Kanawha Hydroelectric project is owned by the Appalachian Power Company and located on the Winfield dam owned and operated by the US Army Corps of Engineers. The 38-foot high Winfield dam is a gated dam with six roller gates spanning 100 ft between piers and consisting of three locks.

Otter Creek Project, Otter Creek, Vermont

Otter Creek Project, Otter Creek, Vermont

Otter Creek is approximately 100 miles long and flows northeasterly from the headwaters of Emerald Lake to its confluence with Lake Champlain. The Otter Creek watershed drains an area of 1,106 square miles and is located in the Champlain Valley, which is a sub-unit of the larger Lake Champlain Basin.