by Hydropower Reform Coalition | Mar 2, 2021
The Project consists of a concrete gravity dam (268 ft long and 44 ft high), a 30-acre reservoir with a storage capacity of 150 acre-feet, Powerhouse No. 1 containing a Francis-type, turbine-generating unit with a rated capacity of 1 MW, Powerhouse No. 2 containing a...
by Hydropower Reform Coalition | Mar 2, 2021