Sunset Falls : P-14295

The proposed hydropower development would consist of the following new facilities: (1) The Dam: a 7-foot-high, 260-foot-long diversion weir with pneumatically-operated bottom-hinged crest gates; (2) The Reservoir: a 2-acre impoundment with a normal water surface...