Search options

In state/territory

Current status

Active license(11)
Removed(2)

Type of facility

Conventional Hydro(12)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Canal/Conduit(2)
Peaking(1)
Run-of-river(1)
Run-of-river/Upstream Peaking(3)
Diversion(0)
Reregulating(0)
Run-of-river/Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(12) [+]
FERC License(9)
FERC Exemption(3)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Bear River

Displaying
1-5 of 13
results

CA

Alta P-2310

 Active license / Conventional Hydro

FERC project name: Drum-Spaulding

CA

Camp Far West P-2997

 Active license / Conventional Hydro

FERC project name: Camp Far West

CA

Combie North P-7731

 Active license / Conventional Hydro

FERC project name: Combie North Aqueduct

CA

Combie South P-2981

 Active license / Conventional Hydro

FERC project name: Lake Combie

ID

Cove Dam P-20

 Removed / Conventional Hydro

FERC project name: Bear River

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy