Search options

In state/territory

Current status

Active license(33)
Dam failed(1)
Removed(1)

Type of facility

Conventional Hydro(32)
Pumped Storage(1)

Definitions

Mode of hydropower operation

Peaking(1)
Run-of-river(17)
Run-of-river/Peaking(1)
Run-of-river/Upstream Peaking(6)
Canal/Conduit(0)
Diversion(0)
Reregulating(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(33) [+]
FERC License(23)
FERC Exemption(10)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Black River

Displaying
1-5 of 34
results

MI

Alverno P-11730

 Active license / Conventional Hydro

FERC project name: Alverno

NY

Beebee Island P-2538

 Active license / Conventional Hydro

FERC project name: Beebee Island

WI

Black River Falls P-3052

 Active license / Conventional Hydro

FERC project name: Black River Falls

NY

Black River Hydro Associates P-5571

 Active license / Conventional Hydro

FERC project name: Denley

NY

Black River Hydro Associates P-6380

 Active license / Conventional Hydro

FERC project name: Rock Island

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy