Search hydropower projects
Search options
In state/territory
Current status
Active license(13)
Mode of hydropower operation
Peaking(5)
Run-of-river(2)
Canal/Conduit(0)
Diversion(0)
Reregulating(0)
Run-of-river/Peaking(0)
Run-of-river/Upstream Peaking(0)
Conventional generating capacity
Pumped storage generating capacity
Owner
Waterway
Permit type
FERC(12)
FERC License(8)
FERC Exemption(4)
FERC Qualifying Conduit(0)
TVA(1)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0)
Lease of Power Privilege(0)
Other(0)
Transferred(0)
US Army Corps of Engineers(0)
FERC license expiration date range
Map
List
Active filters:
- Waterway: Broad River
FERC project name: Ninety-Nine Islands
FERC project name: Capitola
FERC project name: Cherokee Falls
FERC project name: Columbia
FERC project name: Craggy Dam
The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.