Search options

In state/territory

Current status

Type of facility

Definitions

Mode of hydropower operation

Definitions

Conventional generating capacity

Pumped storage generating capacity

Owner

Waterway

Permit type

Generating Power

Ownership Type

FERC license expiration date range

Map
List
Active filters:   

Displaying
results

MA

Beebe Holbrook P-2004

 Active license / Conventional Hydro + Small Hydropower ( ≤ 10 MW)

FERC project name: Holyoke

NH

Bellows Falls P-1855

 Active license / Conventional Hydro

FERC project name: Bellows Falls

MA

Boatlock P-2004

 Active license / Small Hydropower ( ≤ 10 MW) + Conventional Hydro

FERC project name: Holyoke

MA

Cabot P-1889

 Active license / Conventional Hydro

FERC project name: Turners Falls

NH

Canaan P-7528

 Active license / Conventional Hydro + Small Hydropower ( ≤ 10 MW)

FERC project name: Canaan

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.