Search options

In state/territory

Current status

Active license(7)
Non-operating(1)

Type of facility

Conventional Hydro(7)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Canal/Conduit(1)
Peaking(2)
Reregulating(1)
Run-of-river(1)
Diversion(0)
Run-of-river/Peaking(0)
Run-of-river/Upstream Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(5) [+]
FERC License(4)
FERC Exemption(1)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Deschutes River

Displaying
1-5 of 7
results

OR

Bend

 Active license / Conventional Hydro
OR

Central Oregon Siphon P-3571

 Active license / Conventional Hydro

FERC project name: Central Oregon Siphon

OR

Cline Falls

 Active license, Non-operating / Conventional Hydro
OR

Juniper Ridge Hydroelectric Project P-13607

 Active license / Conventional Hydro

FERC project name: Juniper Ridge

OR

Pelton P-2030

 Active license / Conventional Hydro

FERC project name: Pelton Round Butte

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy