Search options

In state/territory

Current status

Active license(5)

Type of facility

Conventional Hydro(5)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Run-of-river(2)
Canal/Conduit(0)
Diversion(0)
Peaking(0)
Reregulating(0)
Run-of-river/Peaking(0)
Run-of-river/Upstream Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(5) [+]
FERC License(5)
FERC Exemption(0)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Henry's Fork Snake River

Displaying
5
results

ID

Ashton P-2381

 Active license / Conventional Hydro

FERC project name: Ashton

ID

Buffalo P-1413

 Active license / Conventional Hydro

FERC project name: Buffalo River

ID

Chester Diversion Hydroelectric Project P-11879

 Active license / Conventional Hydro

FERC project name: Chester Diversion Dam

ID

Island Park P-2973

 Active license / Conventional Hydro

FERC project name: Island Park

ID

St Anthony P-14552

 Active license / Conventional Hydro

FERC project name: St. Anthony

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy