Search options

In state/territory

Current status

Active license(41)

Type of facility

Conventional Hydro(41)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Canal/Conduit(1)
Peaking(6)
Reregulating(1)
Run-of-river(16)
Diversion(0)
Run-of-river/Peaking(0)
Run-of-river/Upstream Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(34) [+]
FERC License(26)
FERC Exemption(8)
FERC Qualifying Conduit(0)
US Army Corps of Engineers(5)
Reclamation(2) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
TVA(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Snake River

Displaying
1-5 of 41
results

ID

American Falls P-2736

 Active license / Conventional Hydro

FERC project name: American Falls

ID

Ashton P-2381

 Active license / Conventional Hydro

FERC project name: Ashton

ID

Bliss P-1975

 Active license / Conventional Hydro

FERC project name: Bliss

ID

Box Canyon P-6543

 Active license / Conventional Hydro

FERC project name: Box Canyon

ID

Brownlee P-1971

 Active license / Conventional Hydro

FERC project name: Hells Canyon

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy