by Hydropower Reform Coalition | Mar 2, 2021
Upper Baker development- a powerhouse containing two turbine-generator units with a total installed capacity of 90.70 MW; downstream fish passage facilities; and appurtenant facilities. Lower Baker development- a powerhouse containing a single turbine-generator unit...
by Hydropower Reform Coalition | Mar 2, 2021
Upper Baker development- a powerhouse containing two turbine-generator units with a total installed capacity of 90.70 MW; downstream fish passage facilities; and appurtenant facilities. Lower Baker development- a powerhouse containing a single turbine-generator unit...