by Hydropower Reform Coalition | Mar 2, 2021
The project consists of a concrete gravity dam with a powerhouse having an installed capacity of 1.52 MW. The project generates on average about 8,890 MWh annually. The dam is ia 362-foot-long concrete gravity dam with a maximum height of 28 ft.
by Hydropower Reform Coalition | Mar 2, 2021