by Hydropower Reform Coalition | Mar 2, 2021
The Taum Sauk Pumped Storage Project received a FERC license in July 2014. The authorized capacity of the project is 442.5 MW. The Taum Sauk Project consists of a 54.5-acre upper reservoir located on Proffit Mountain and a 363-acre lower reservoir. The upper reservoir...