John C Boyle P-2082

Klamath Hydropower Project Facts Year built: 1918 and later Capacity: 160 megawatts Generation provided: 1% of PacifiCorp demand Miles of habitat blocked: 350 Fish species affected: coho, chinook, steelhead, lamprey Klamath Hydropower Project Consists of: Keno Dam, a...

Copco 2 P-2082

Klamath Hydropower Project Facts Year built: 1918 and later Capacity: 160 megawatts Generation provided: 1% of PacifiCorp demand Miles of habitat blocked: 350 Fish species affected: coho, chinook, steelhead, lamprey Klamath Hydropower Project Consists of: Keno Dam, a...

Copco 1 P-2082

Klamath Hydropower Project Facts Year built: 1918 and later Capacity: 160 megawatts Generation provided: 1% of PacifiCorp demand Miles of habitat blocked: 350 Fish species affected: coho, chinook, steelhead, lamprey Klamath Hydropower Project Consists of: Keno Dam, a...

Iron Gate P-2082

Klamath Hydropower Project Facts Year built: 1918 and later Capacity: 160 megawatts Generation provided: 1% of PacifiCorp demand Miles of habitat blocked: 350 Fish species affected: coho, chinook, steelhead, lamprey Klamath Hydropower Project Consists of: Keno Dam, a...

Link River Dam, West Side P-2082

In 1921 PacifiCorp’s predecessor, the California Oregon Power Company blasted channels through a rock formation at the outlet of Upper Klamath Lake and constructed Link River Dam to control lake levels, supply water to the Klamath Irrigation Project, and produce...