CO

Pole Hill

General information

Waterway  Colorado River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit Reclamation

Ownership and operation

Owner Reclamation Great Plains Region (GP)
Owner type Reclamation
Year first online (conventional hydro) 1954
Transmission or distribution system owner WAPA-- Western Area Power Administration

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 38.2 MW
Average annual net hydropower generation 172,047.7 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates