UT

Gateway

General information

Waterway  Weber River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit Transferred

Ownership and operation

Owner Weber Basin Water Conservancy District
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1958
Transmission or distribution system owner PacifiCorp

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 4.0 MW
Average annual net hydropower generation 10,724.7 MWH

Is there something you’d like to add or correct? Please let us know.