Arrowrock P-4656
General information | |
| Waterway |
Boise River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-4656 |
| FERC project name | Arrowrock Dam |
| Permit issued | 3/22/89 |
| Permit expiration | 2/24/39 |
Ownership and operation | |
| Owner | Big Bend Irrigation District |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 2010 |
| Transmission or distribution system owner | Idaho Power Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 15.0 MW |
| Average annual net hydropower generation | 72,270.3 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed