ID

Low Line No. 8 P-5056

General information

Waterway  Lowline Canal
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-5056
FERC project name Low Line No. 8
Permit issued 10/18/81

Ownership and operation

Owner Boise Project Board of Control
Owner type Publicly Owned Utility

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.4 MW
Average annual net hydropower generation 1,500.0 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates