KY

Barkley

General information

Waterway  Cumberland River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit US Army Corps of Engineers

Ownership and operation

Owner USCE-Nashville District
Owner type USACE
Year first online (conventional hydro) 1966
Transmission or distribution system owner Tennessee Valley Authority

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 130.0 MW
Average annual net hydropower generation 665,206.9 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates