General information

Waterway  Cumberland River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit US Army Corps of Engineers

Ownership and operation

Owner USCE-Nashville District
Owner type USACE
Year first online (conventional hydro) 1958
Transmission or distribution system owner Tennessee Valley Authority

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 36.0 MW
Average annual net hydropower generation 165,817.1 MWH