SC
St Stephen
General information | |
| Waterway |
Lake Moultrie |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river/Peaking |
| Type of permit | US Army Corps of Engineers |
Ownership and operation | |
| Owner | US Army Corps of Engineers |
| Owner type | USACE |
| Year first online (conventional hydro) | 1985 |
| Transmission or distribution system owner | South Carolina Public Service Authority |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 84.0 MW |
| Average annual net hydropower generation | 187,452.2 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

