Martin Dam P-349
General information | |
Waterway |
Tallapoosa River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-349 |
FERC project name | Martin Dam |
Permit issued | 12/12/15 |
Permit expiration | 11/26/45 |
Ownership and operation | |
Owner | Alabama Power Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1927 |
Transmission or distribution system owner | Alabama Power Co |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 210.6 MW |
Average annual net hydropower generation | 308,903.0 MWH |
The Martin Project is located on the Tallapoosa River in Alabama in Tallapoosa, Elmore and Coosa Counties.
The Martin Dam Project includes a dam, powerhouse, impoundment, and recreation facilities, described in more detail below.
The project includes Lake Martin, an approximately 31-mile-long, 41,450-acre reservoir at the maximum full pool elevation of 491 feet mean sea level (msl). Lake Martin is formed by a 2,255-foot-long concrete gravity dam and earth dike section (Martin Dam), which includes a 720-foot-long gated spillway section with 20 vertical lift spillway gates, a 255-foot-long concrete gravity non-overflow section, an approximately 1,000-foot-long earth embankment on the left abutment, and a 280-foot-long concrete gravity intake structure with 12 intake gates fitted with trashracks. There are two, 450-foot-long transmission lines that lead from the powerhouse to the project’s switchyard; and appurtenant facilities include a low auxiliary dam that forms a stilling basin for spillway discharges, and a powerhouse access road.
Source: FERC
Is there something you’d like to add or correct? Please let us know.
Related posts
- From American Rivers 04/18/22
America’s Most Endangered Rivers of 2022 Spotlights Rivers in Crisis Mode
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition