WA

Boundary P-2144

General information

Waterway  Pend Oreille River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-2144
FERC project name Boundary
Permit issued 3/15/13
Permit expiration 2/24/55

Ownership and operation

Owner Seattle City of
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1967
Transmission or distribution system owner Bonneville Power Administration

Power and generating capacity

Number of units 6
Total capacity from hydraulic turbine-generator units within each plant 1,118.6 MW
Average annual net hydropower generation 3,771,540.6 MWH

Download license summary for the Boundary project.

The project is located on the Pend Oreille River near the city of Metaline Falls, in Pend Oreille County, Washington. The project occupies 609.24 acres of federal land managed by the U.S. Department of Agriculture, Forest Service (Forest Service) within the Colville National Forest, and 329.35 acres of federal lands managed by the U.S. Bureau of Land Management (BLM).

The license for this project was issued in conjunction with the license surrender for the Sullivan Creek Project (P-2225) based on the comprehensive settlement provision signed by Seattle City and Light, PUD No. 1 of Pend Orielle County, Washington, resource agencies, tribes, and NGO representatives including HRC members.

The Boundary Project is located at river mile 17 on the Pend Oreille River in a narrow canyon in the Selkirk Mountains in the northeast corner of Washington, about 10 miles north of the city of Metaline Falls and one mile south of the U.S.-Canada border. The Pend Oreille River is about 120 miles long from its origin at Lake Pend Oreille in Albeni Falls, Idaho to its confluence with the Columbia River in British Columbia, Canada. The Pend Oreille River system is highly regulated, with flows controlled by seven hydroelectric and storage projects upstream from Boundary dam, and two in Canada downstream from the project. The project’s reservoir is located immediately downstream of the District’s Box Canyon Project No. 2042. Lands surrounding the project include mostly forest managed by the Forest Service and BLM for multiple uses, as well as some private land used for commercial, recreation, mining, and agricultural production.

(Source: FERC)

 

Milestones

License Application Submitted 09-29-2009
FEIS Issued 09-09-2011
License Issued 03-20-2013
Multiparty Settlement Signed 03-29-2010

Is there something you’d like to add or correct? Please let us know.