Cooper Lake P-2170
General information | |
Waterway |
Cooper Creek Kenai River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2170 |
FERC project name | Cooper Lake |
Permit issued | 8/19/07 |
Permit expiration | 7/27/57 |
Ownership and operation | |
Owner | Chugach Electric Assn Inc |
Owner type | Cooperative |
Year first online (conventional hydro) | 1961 |
Transmission or distribution system owner | Chugach Electric Assn Inc |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 19.4 MW |
Average annual net hydropower generation | 41,075.3 MWH |
The project is located on Cooper Lake, Cooper Creek, and Kenai Lake, near the community of Cooper Landing in south-central Alaska.
Project operations currently divert all flow from Cooper Lake through the tunnel/penstock to the project powerhouse, where it is discharged into Kenai Lake. The4.8-mile-long Cooper Creek bypassed reach below the Cooper Lake dam receives no flow.
A settlement agreement that details provisions for operation of project, and resource protection measures among other things, was signed by various stakeholders in 2005.
Milestones
Settlement Filed | 08-31-2005 |
License Application Filed | 04-20-2005 |
EA Issued | 11-17-2006 |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/24/2024
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts