Robert Moses Niagara P-2216
General information | |
| Waterway |
Niagara River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river/Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2216 |
| FERC project name | Robert Moses-Niagara |
| Permit issued | 3/10/07 |
| Permit expiration | 8/27/57 |
Ownership and operation | |
| Owner | New York Power Authority |
| Owner type | State |
| Year first online (conventional hydro) | 1961 |
| Transmission or distribution system owner | New York Power Authority |
Power and generating capacity | |
| Number of units | 13 |
| Total capacity from hydraulic turbine-generator units within each plant | 2,429.1 MW |
| Average annual net hydropower generation | 14,178,134.7 MWH |
The Niagara Project was specifically authorized by Congress in the Niagara
Redevelopment Act of 1957 and is governed by two treaties ( Boundary Waters Treaty of 1909 between the United States and Canada and Niagara River Water Diversion Treaty of 1950) and project-specific legislation.
The existing Niagara Project is located in Niagara County, New York, on the Niagara River, a 35-mile-long waterway that connects Lake Erie and Lake Ontario and is an international boundary water between the United States and Canada.
The project has two developments: the 2,515.5-MW conventional Robert Moses development and the 240-MW Lewiston pumped storage development.
Milestones
| License Application Filed | 08-18-2005 |
| Settlement Filed | 08-19-2005 |
| DEIS Issued | 06-14-2006 |
| FEIS Issued | 12-29-2006 |
| License Order Issued and Settlement Approved | 03-15-2007 |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed