Rhodhiss P-2232


General information

Waterway  Catawba River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-2232
FERC project name Catawba-Wateree
Other projects with this FERC number
Permit issued 11/20/15
Permit expiration 10/27/55

Ownership and operation

Owner Duke Energy Carolinas, LLC
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1925
Transmission or distribution system owner Duke Energy Carolinas, LLC

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 25.5 MW
Average annual net hydropower generation 65,305.5 MWH