Sullivan P-2233
General information | |
Waterway |
Willamette River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2233 |
FERC project name | Willamette Falls |
Permit issued | 12/3/05 |
Permit expiration | 11/26/35 |
Ownership and operation | |
Owner | Portland General Electric Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1924 |
Transmission or distribution system owner | Portland General Electric Co |
Power and generating capacity | |
Number of units | 15 |
Total capacity from hydraulic turbine-generator units within each plant | 15.4 MW |
Average annual net hydropower generation | 113,053.9 MWH |
The Willamette Falls project dam is located at river mile (RM) 26.5 on the Willamette River. Willamette Falls is a horseshoe-shaped, 40-foot-high, natural waterfall that marks the head of the tidally influenced lower Willamette River, a tributary of the Columbia River. The project dam is located along the crest of Willamette Falls and consists of a 600-foot-long, 20-foot-high concrete spillway section with a crest elevation of 55.0 feet above mean sea level (msl) and a 2,300-foot-long, 6 to 20-foot-high concrete dam with a crest elevation of 52.0 feet msl (54.0 feet msl with flashboards). The 600- foot-long spillway section is equipped with stop logs to prevent overflow during normal flow conditions.
The project contains two separate hydroelectric generating developments: (1) the 15,180-kilowatt (kW), T.W. Sullivan development located on the west (West Linn) side of the river at Willamette Falls and (2) the 1,500-kW, BHPC development located on the east (Oregon City) side of the river at Willamette Falls. It also includes the West Linn Paper Company’s (formerly Simpson Development) grinder rooms number two and three at the north abutment of the dam.
Source: FERC
The Willamette Falls project was certified as a low-impact project by the Low Impact Hydropower Institute in December 2012.
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition