Brainerd P-2533
General information | |
| Waterway |
Mississippi River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2533 |
| FERC project name | Brainerd |
| Permit issued | 2/25/93 |
| Permit expiration | 2/24/23 |
Ownership and operation | |
| Owner | City of Brainerd & Pub Utilities Com. |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1917 |
| Transmission or distribution system owner | Brainerd Public Utilities |
Power and generating capacity | |
| Number of units | 5 |
| Total capacity from hydraulic turbine-generator units within each plant | 2.9 MW |
| Average annual net hydropower generation | 15,141.7 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
Related posts
- From American Rivers 11/04/22
The mighty Mississippi running dry: what you need to know
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025