ME
Hydro Kennebec Project P-2611
General information | |
| Waterway |
Kennebec River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2611 |
| FERC project name | Hydro-Kennebec |
| Permit issued | 10/10/86 |
| Permit expiration | 9/26/36 |
Ownership and operation | |
| Owner | Hydro Kennebec LLC |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1989 |
| Transmission or distribution system owner | Central Maine Power Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 15.4 MW |
| Average annual net hydropower generation | 81,009.4 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From Trout Unlimited 03/23/23
NOAA biological opinion unrealistic for Kennebec River recovery - From Trout Unlimited 02/01/23
Maine’s Atlantic salmon on the brink - From Trout Unlimited 01/20/22
In Maine, fish following ancient instincts find newly open rivers
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

