MA
Lawrence Hydroelectric Associates P-2800
General information | |
| Waterway |
Merrimack River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2800 |
| FERC project name | Lawrence |
| Permit issued | 11/29/78 |
| Permit expiration | 11/26/28 |
Ownership and operation | |
| Owner | Lawrence Hydroelectric Assoc |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1981 |
| Transmission or distribution system owner | Massachusetts Electric Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 14.8 MW |
| Average annual net hydropower generation | 67,914.2 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

