VT

North Branch 3 P-5124

General information

Waterway  North Branch Winooski River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-5124
FERC project name North Branch No 3
Permit issued 11/18/82
Permit expiration 10/27/22

Ownership and operation

Owner Washington Electric Coop Inc
Owner type Cooperative
Year first online (conventional hydro) 1985
Transmission or distribution system owner Washington Electric Coop - (VT)

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 1.0 MW
Average annual net hydropower generation 2,800.8 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates