MA
Collins Facility P-6544
General information | |
| Waterway |
Chicopee River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-6544 |
| FERC project name | Collins |
| Permit issued | 2/4/84 |
Ownership and operation | |
| Owner | Ampersand Collins Hydro, LLC. |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1985 |
| Transmission or distribution system owner | Massachusetts Electric Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 1.2 MW |
| Average annual net hydropower generation | 4,857.9 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025