ID
Bypass P-9070
General information | |
Waterway |
North Side Main Canal |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-9070 |
FERC project name | Bypass |
Permit issued | 9/21/85 |
Ownership and operation | |
Owner | Enel North America, Inc. |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 1987 |
Transmission or distribution system owner | Idaho Power Co |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 9.9 MW |
Average annual net hydropower generation | 26,347.6 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/24/2024
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts