MN
St. Cloud P-4108
General information | |
| Waterway |
Mississippi River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-4108 |
| FERC project name | St Cloud |
| Permit issued | 11/30/84 |
| Permit expiration | 11/26/24 |
Ownership and operation | |
| Owner | St Cloud, City of |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1988 |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 8.6 MW |
| Average annual net hydropower generation | 42,311.0 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
Related posts
- From American Rivers 11/04/22
The mighty Mississippi running dry: what you need to know
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

