AL
Elba P-10691
General information | |
Waterway |
Pea River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-10691 |
FERC project name | Elba |
Permit issued | 9/10/89 |
Ownership and operation | |
Owner | Elba Hydro-Electric Power, Inc. |
Owner type | Private Non-utility |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 2.4 MW |
Average annual net hydropower generation | 11,000.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/24/2024
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts