Monroe Cold Spring P-14441

General information

Waterway  Water Supply Pipeline
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-14441
FERC project name Monroe Cold Spring
Permit issued 10/26/12

Ownership and operation

Owner Monroe City
Owner type Publicly Owned Utility
Year first online (conventional hydro) 2013

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.0 MW
Average annual net hydropower generation 229.0 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure