TX
Abbott TP 3
General information | |
Waterway |
Guadalupe River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | Unknown |
Ownership and operation | |
Owner | Guadalupe Blanco River Auth |
Owner type | State |
Year first online (conventional hydro) | 1927 |
Transmission or distribution system owner | Guadalupe Valley Elec Coop Inc |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 2.8 mW |
Average annual net hydropower generation | 9,882.3 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Trout Unlimited3/23/2023
NOAA biological opinion unrealistic for Kennebec River recovery
From South Yuba River Citizens League3/20/2023
SYRCL’s 40th Anniversary Film YUBA IS THE HEART is now available to view.