PA
Allegheny 8 P-3021
General information | |
| Waterway |
Allegheny River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-3021 |
| FERC project name | Allegheny River Locks/Dams Nos 8 & 9 |
| Other projects with this FERC number | |
| Permit issued | 3/22/85 |
| Permit expiration | 2/24/35 |
Ownership and operation | |
| Owner | Northbrook Allegheny Operations LLC |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1990 |
| Transmission or distribution system owner | New York State Elec & Gas Corp |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 13.6 MW |
| Average annual net hydropower generation | 88,566.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

