Allens Falls P-10461
General information | |
Waterway |
West Branch St. Regis River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-10461 |
FERC project name | West Branch St. Regis River |
Other projects with this FERC number | |
Permit issued | 9/22/02 |
Permit expiration | 8/27/42 |
Ownership and operation | |
Owner | Erie Boulevard Hydropower LP |
Owner type | Wholesale Power Marketer |
Year first online (conventional hydro) | 1927 |
Transmission or distribution system owner | Niagara Mohawk Power Corp. |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 4.0 MW |
Average annual net hydropower generation | 20,766.2 MWH |
This project consists of 2.4-megawatt (MW) Parishville Hydroelectric Project (FERC No. 10461) and 4.4-MW Allens Falls HydroelectricProject (FERC No. 10462) both located on the West Branch of St. Regis River in St. Lawrence County, New York.
The project provides an average annual generation of 34,730 megawatt-hours. The Parishville Project, furthest upstream, discharges into the Allens Falls Projectimpoundment.
The Parishville development consists of a dam, a 70-acre reservoir, a 2,561-foot-long penstock, a powerhouse housing a 2.4-MW turbine/generator unit, a 4.8-kV transmission line, and appurtenant facilities.
The Allens Falls development consists of a concrete gravity-type dam, a 108-acre reservoir, a 9,344- foot-long pipeline, a surge tank, an 886-foot-long penstock, a powerhouse housing a 4.4-MW turbine/generator unit, a 2.4-mile-long 115-kV transmission line, and appurtenant facilities.
The Settlement Agreement filed before FERC addresses multiple issues. The Settlement was signed by: Adirondack Mountain Club, American Rivers, American Whitewater, Erie Boulevard, New York Rivers United, New York State Conservation Council, New York State Department of Environmental Conservation, St. Lawrence County, Town of Parishville, Trout Unlimited, US DOI, and US FWS
Milestones
Settlement Filed | 09-11-2001 |
FEA Issued | 08-08-2002 |
DEA Issued | 03-22-2002 |
License Issued | 09-27-2002 |
Is there something you’d like to add or correct? Please let us know.
Related resources
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition