American Tissue P-2809
General information | |
Waterway | Cobbosseecontee Stream |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2809 |
FERC project name | American Tissue |
Permit issued | 5/4/1979 |
Permit expires | 4/26/2019 |
Ownership and operation | |
Owner | KEI (Maine) Power Management (III) LLC |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 1985 |
Transmission or distribution system owner | Central Maine Power Co |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 1.0 mW |
Average annual net hydropower generation | 5,313.4 mWH |