ID
Anderson Ranch
General information | |
Waterway |
South Fork Boise River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | Reclamation |
Ownership and operation | |
Owner | Reclamation Pacific Northwest Region (PN) |
Owner type | Reclamation |
Year first online (conventional hydro) | 1950 |
Transmission or distribution system owner | Bonneville Power Administration |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 40.0 MW |
Average annual net hydropower generation | 124,816.5 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Alabama Rivers Alliance2/21/2025
ARA and SELC submit comments for the R.L. Harris Dam relicensing on the Tallapoosa River
From Idaho Rivers United1/14/2025
Federal agencies prepare a SEIS to update the Columbia River System Operations