TN

Apalachia

General information

Waterway  Hiwassee River
Current status   Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit TVA

Ownership and operation

Owner Tennessee Valley Authority
Owner type TVA
Year first online (conventional hydro) 1943
Transmission or distribution system owner Tennessee Valley Authority

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 93.6 mW
Average annual net hydropower generation 368,316.6 mWH

News and updates

From Trout Unlimited5/26/2022

The next half-century of hydro

From Alabama Rivers Alliance5/26/2022

Jack’s Spring Policy Update

See all news and updates